A few little jobs done towards the tub fitting.
I have cut the tops off the chassis’ forward 6 floor support hoops. Once the tub has been bolted in the right place using the rear x-member and middle outrigger mounts, the front hoops will be measured and marked, the tub removed and the theoops welded back in. Once the front hoops are in, a length of box tubing will provide a straight datum to align the other cut hoops for refitting. By cutting them as I have, the welded joints will be in compression, thus less likely to crack, and the welds will be far enough away from the main rails to leave the galv coat unaffected.
I have also refurbished the oiginal sills removing all the filth but leaving the galv in place. There were a few small patches of light surface rust where the galv has given way (principally on the front end brackets), but a spray of silver enamel and Waxoiling when fitted will give plenty of protection. The lower door seals have been removed to fit new counterparts.

Speak Your Mind
You must be logged in to post a comment.