The fairlead has arrived from Bavid Bowyer. Less than 48hrs – not a bad turn-round time. Naturally, the securing bolts god a good coating of copper grease, and I gave the back of the frame (where it sist against the winch mount) a liberal coating too to prevent any possibilty of corrosion.
I have also fitted the facia panels (not easy single handed). The centre instruments (battery and oil pressure guages) need wiring up, as does the rear wash/wipe switch. Once all the bulkhead wiring is complete, I’ll refit the plastic parcel tray and grey facia panel (might get repainted black to match the facia).

Speak Your Mind
You must be logged in to post a comment.